Dream House Episode Guide
- Online 0 locations
- On DVD 0 available
- On TV 16 showings
- Cast & Credits 0 people
- Episode Guide 174 episodes
Episode Guide
-
Although Exhausted, the Mackeys Prepare to Move in and Set a Date for a Housewarming Party
The Mackeys prepare to move in and host a party.
-
Anticipation
The lights are tested and the power connected in the new house.
-
The Architects
Budget concerns; hiring an architect.
-
Artwork for the House
Friends create artwork; tile-making party.
-
The B.O.A.R. Meeting
Board of Architectural Review.
-
Baby on Board
A couple building their dream home in Boulder, Colo. welcome their first child.
-
Beach House Bummer
A couple must remodel their entire kitchen.
-
Beaufort Bound
Georgia couple searches for a new home.
-
The Big Dig
Tree roots cause problems during the excavation.
-
The BOAR's Back
Board of Architectural Review.
-
Boss Lady
Her first job as a general contractor is her own dream house.
-
Brandon's Big Day
Brandon's dream house is finally complete.
-
Bring on the Color
Siding is completed; the family takes a vacation in France; construction begins on the steel deck.
-
The Builder
Choosing a builder.
-
The Builders
Building contractors; plumbing fixtures/tile.
-
Building ... At Last
Clearing land; pouring a foundation.
-
Building the Walls
The construction of the foundation is met with many challenges.
-
The Building Trades
Workers interact to complete the house on time.
-
Bulletproof
The house is six months behind schedule, but construction is in full swing.
-
Burnin' Down the House
Anita and Brad Feder have trouble with the budget for their house; electricians discuss lighting options; steel work at the home is behind schedule; Anita makes some decisions without Brad.
-
Busting the Foundation Budget
The contractor tries to stay on budget, as more unexpected costs add up.
-
California Dreamin'
Three college friends invest in a dilapidated San Diego beach house.
Tomorrow at 1:00pm EST - Do-It-Yourself Network - Cementing Friendship
-
Cheryl Takes Charge
Cheryl returns from Mexico.
-
Chimneys and Windows
Leaded-glass window.
-
Chuck Goes Shopping
Builder shops for supplies; spiral staircase.
-
Chuck Takes Over as Contractor
Hand-painted tiles; Italian mosaic.
-
The Closing
Stucco; painting; finishing wood floors; carpet installation; closing on a house.
-
The Conclusion?
Disagreements over kitchen design; finished renovation.
-
Concrete Pour
A couple turn the corner and finish tearing down their old home and start building their new one.
-
Concrete Pumping Problems
Problems occur while the team pumps concrete to finish the garage.
-
Condomania
Exterior window casings and rock; interior and closet doors; countertops and cabinets.
-
Confrontation
Tension between Robert and Cheryl escalates.
-
Control Issues
The focus shifts to interior lighting as the couple take matters into their own hands.
-
Cost Cutting
Cutting costs; interior designers.
-
Cuts & Bruises
The couple are on the verge of finishing their home.
-
Deadline Looms
Six weeks to go and 43 doors to install.
-
Decisions, Decisions
Shopping for supplies; installing shingle siding.
-
Delays
Delays; landscape designer; stained glass; spiral staircase is installed.
-
Demolition Dangers
Geno struggles to tear down the back deck; a contractor discovers that the family was living in a death-trap.
-
Design Decisions
A designer helps Kelli focus on her Thanksgiving dinner plans.
Saturday 5th December 8:00pm EST - Do-It-Yourself Network -
Digging In
Excavation begins on a restaurant.
-
Down to the Wire
A bevy of tradesmen work away on landscaping and installing cabinets throughout the house.
-
Down to the Wire
A couple has 30 days to get their house ready to move in to.
-
Drawn to the Journey
A couple with a baby on the way decide to build their own home.
-
Dream House 3
Delays; a new crew; the family considers moving out.
-
Dream House 3
The family moves out; the framing crew digs through plan changes.
-
Dream House 3
Mortgage loan deadline approaches; furniture and accessories arrive; the house is presented to the public.
-
Dreamhouse on the Coast of Massachusetts
Man builds a home on the coast of Massachusetts.
-
Dressing the House
Problems with the design budget arise; the unique design of the home impacts every decision the designers make.
-
Emily's Indecision
Daughter has big ideas for house.
-
End of Demolition, Begin Construction
The Rush family begins to see their dream house take shape.
-
Excavation, Concrete Foundation and Other Delays
A family faces more delays as the foundation is laid.
-
Experience Required
A lack of experience affects the budget and timeline.
Tomorrow at 1:30pm EST - Do-It-Yourself Network -
Faulty Floors; Raising the Walls
Silene and Geno Rush begin to fall further behind deadline on their dream house.
-
Finally
The couple moves in to their dream house.
-
Financing
Financing/mortgages; clearing and excavating.
-
Finding an Interior Designer
Hiring an interior designer; state-of-the-art heating system.
-
Finished but Not Done
The house passes the final inspection but things still need to be completed before the housewarming.
-
The Finishes That Wouldn't End
Building a custom house; trim; cabinets; fireplace.
-
Finishing the Kitchen; Racing the Load Deadline
60 custom made cabinets are installed and Geno tries to finish up the tiling on the Rush's dream house.
-
Finishing Touches
Counter tops; landscaping mistakes.
-
Five Floors Up
A couple race to meet their building deadline.
-
Foundation Flaws
A couple trying to build their dream home run into trouble when excavation reveals 'bad dirt' at the build site.
-
Foundation Problems and Solutions
Rocky soil and a steep slope cause problems for laying a foundation.
Sunday 6th December 9:30pm EST - Do-It-Yourself Network -
Goodbye Old House, Hello New
Applying for a building permit; installing a septic system; house is prepared for razing.
-
A Grand Convergence
Staining woodwork; stone masons work on the fireplace.
-
Ground Break
A couple considers the high costs of building their dream home.
-
Groundbreaking
Christopher and Tina are determined to build their home on a very steep hillside in Boulder, Co.
-
Grounding Issues
Problems persist due to lack of communication; the inspector has problems with the electrical wiring.
-
Hauling Concrete
A couple building their dream home faces a setback when the trucks hauling concrete can't climb their steep driveway.
-
Heat Wave
Framing progress.
-
Heating, Cooling and Fixtures
A sub-contractor causes more problems for Geno.
-
Here Comes the Rain
Hard rain floods the basement of the dream house.
-
Home at Last
The last steps in constructions are completed.
-
Home for the Holidays?
The Cains are two weeks from moving in, and the railings are still an issue; custom closets are installed.
-
The Home is Finished
Unresolved issues; pitfalls when building.
-
The Home's Timber Frame Is Completed While the Mackeys Enter a Sweat Equity Phase
The pressure is on as Stephen does the AV wiring.
-
The Honeymoon is Over
Clashing over the kitchen design.
-
House Emerges
A house begins to emerge from the concrete foundation.
-
House of Many Colors
The landscaping process begins; lighting changes slow the schedule; the house is painted and carpeted in bold colors; kitchen issues.
-
The House Takes Shape
Foundation; windows.
-
The Impossible Lot
A steep triangular lot poses challenges to architects and contractors.
-
In Sickness and in Health
Pouring the foundation.
-
Initial Steps
Project overview; suburban development.
-
The Inspection
House inspection.
-
Inspection Blues
Interior work is at a standstill while exterior work continues.
-
Is the End in Sight?
A San Diego investment house.
-
Kitchen Choices
Analyzing a renovation budget.
-
Living With Construction
Being at a construction site.
-
Long Day's Journey
Changes continue to hamper progress on the house.
-
Meet the Builder
Couple decides to remodel home after difficult winter.
-
Meet the Builder
Expensive remodeling project.
- Meet the Cains
-
Meet the Cefai Family
Remodeling problems and solutions.
-
Meet the Sandbergs
A ranch house becomes a two-story home.
-
Missed Schedule
Delays hinder the building process; granite countertop; tile.
-
A Missing Person
Robert leaves the project; Cheryl tries to finish the house.
-
The Missing Piece
Front-porch modification; metal roofing; interior layout.
-
Mondo Condo
The threat of a view-blocking condominium looms.
-
Money and Demolition
A couple experiences sticker shock.
-
Money, Money, Money
Construction/mortgage loans.
-
Money Pit
A San Diego beach house quickly becomes a money pit.
-
More Chaos
The back foundation wall cracks and must be rebuilt.
-
More Choices
Stability of the foundation; exterior of the home.
- More Snags; Time and Money
-
The More Things Change
Air-return grate; brick patio.
-
The Move
Tour of the finished house.
-
Neighborly Ways
Choosing custom house plans.
-
Neighbors Notice
Newcomers to a historic district face scrutiny.
-
A New Beginning
Delays persist in spite of site supervisor hiring.
-
No HVAC
Construction oversight.
-
Not a Happy Holiday
Designing the kitchen and family room; budget concerns; the holiday season arrives.
-
Off to Mexico
Construction delays; new job in Mexico.
-
Phase 1 Construction
Plumbing supplies; drainage plan; rotten wood.
-
The Phoenix Rises
Soil problems; friends help with building/decorating.
-
The Plan
Developing a plan; stock vs. customized plans; zoning.
-
Planning the Finish
Meeting the interior designer; landscaping begins.
-
Pouring the Floors
Contractor James Casanova prepares for the final appearance by the troublesome concrete pumper truck.
-
The Pressure Increases
The construction process slows; plumbing.
-
Pressure Mounts as Stephen Begins Work on Railings and Tile Installation
Stephen begins tile installation.
-
Problems, Problems Everywhere!
A nail-gun accident and bad plumbing are just two of the headaches plaguing a dream home.
-
Putting on the Roof
After numerous delays, the roofers finally get started.
-
Race to the Finish
Kelli Smith and James Ladd try to get the house ready for a big party that's only a month away.
Saturday 5th December 8:30pm EST - Do-It-Yourself Network -
Racing the Clock
A new crisis arises that might be the one to crumble Tina and Christopher Herr's plans to move into their dream house.
-
Racing the Loan Deadline
With the expiration of the construction loan looming, Christopher and Tina rush to complete their home.
-
Racing to the Finish
Fixing the stairs and installing custom cabinetry are only a few of the numerous things that must be done before Brandon can move into his house.
-
Raising the Walls
A house is ready for a major transformation.
-
Reality Sets In
Staying within budget.
-
Roof Trouble
No one takes responsibility for problems with the house.
-
Rush Home Demolition Begins
Silene and Geno handle as much of the demolition as possible by themselves.
-
Sealing the House
Sealing a house with a roof and new windows.
-
Sealing the House for Winter
Building deadlines; restoration store; preparing for a New England winter.
-
The Second Year
Construction enters its second year.
-
Setting the Deadline
The difficulties faced by the Cain family as they try to build their dream home in Riverside, Ill.
-
Shift Change
The roof gets completed, but concrete problems threaten the foundation.
-
Shopping
Buying a rug; shopping for appliances; building costs.
-
A Shorter Chimney
Neighbors dispute the height of a chimney.
-
Slow Going
Progress on the San Diego house is slow going.
Wednesday 9th December 1:30pm EST - Do-It-Yourself Network -
So Close and Yet So Far
The Feder family has a number of details that need to be completed before they can move into their new home.
-
The Squabble
Guest cottage; gable; living room; bedroom.
-
St. Clarice's Fire
The builder, painter and homeowner go about their various tasks.
-
Steady Progress
The kitchen gets started; stucco is applied.
-
Stephen Finishes Wiring and Tackles the Wine-Tasting Bar
Finishing wiring; tackling the wine-tasting bar.
-
Stone Walls and Windows
Covering stucco with granite.
-
Stone Walls and Windows
Re-covering stucco walls with granite; replacing 33 windows.
-
Strained Budget, Frayed Nerves
Despite a strained budget and numerous delays, homeowners try to keep their Wheaton house.
- Styrofoam Dreams
-
That Sinking Feeling
The Cains prepare to move in; tile problems continue; changes to the landscaping.
-
They're Here
The Beaufort house is finished.
-
Three-Ring Circus
Homeowners near the final stages of construction.
-
Three Stories Up, Two Steps Back
Framing has begun, but problems arise; design decisions have an effect on an overtaxed budget.
-
Tile Shortage
The Cains worry that the house they are building may be too small; selecting countertops; installing the steel roof.
-
Time to Frame
Framing begins on the Illinois dream house.
-
To Be or Not to Be
The work crew 'fast tracks' the design.
-
Tower of Babble
A couple decides how to handle concrete problems as the lighting plans begin.
-
Train Wreck
Difficulties and delays overwhelm the Landrys.
-
Trimming the Budget
A shipment of roofing materials has to be turned away due to the treacherous driveway.
-
Trouble With Trenches
A newly dug trench causes trouble.
Wednesday 9th December 1:00pm EST - Do-It-Yourself Network -
Unconventional Choices
Epoxy-finished walls; mirrored ceilings; basement master suite.
-
Unexpected Costs
Silene and Geno are thrilled to see progress on their dream house but they are faced with a major hit to their budget.
-
Unexpected Costs
Unexpected costs take a chunk out of a young investor's money.
-
Unpleasant Surprises
Demolition and excavation continues and with it some unpleasant surprises.
-
The Waiting Game
The house nears completion as the Landrys contemplate their move-in date.
-
Wall Goes Up, Wall Comes Down
A house in Boulder, Colo. runs into construction snags.
-
Walls of Glass
The Cains hope to move into their home by Thanksgiving.
-
The Wedding
Village board decides the fate of the chimney; wedding plans.
-
Welcome to Controversy
History of Bruno's house.
-
The Wheels Come Off
Going over budget.
-
Winter Weather and Roofing Woes
The Colorado winter puts a couple's dream home behind schedule.
-
Winter Woes
The dream house must be closed in before winter arrives.
-
Wiring the House
The cost of custom design touches and luxury items; challenges of building a home.
-
World Without End
Bruno decides the house is too small.
-
Worth the Wait
The Feder family moves into their spacious new home before it is finished.
